Voice-Driven Engines

AI-Powered Construction Tools
You Control By Voice.

Interview-driven workflows for scheduling, risk analysis, and estimating — built for the field. No keyboard required. Just talk.

3
Voice engines — estimate, schedule, advise
0
Spreadsheets required to get a full estimate
LPS
Last Planner System logic built in
P6
Primavera & MS Project export compatible
01
Estimating Engine
Voice-Guided Estimator
What it does

A voice-driven estimating agent that guides subcontractors through project assumptions and job details while executing backend cost logic. Walk through your concrete, plumbing, or framing job by voice or text. The agent asks clarifying questions, runs the numbers, and delivers a fully itemized estimate.

Capabilities
  • Guides contractor through scope, size, site conditions, and material selections
  • Applies trade-specific productivity rates and regional material pricing
  • Produces line-item estimate with CSI-format cost codes
  • Generates a formatted quote proposal PDF ready for client delivery
Output
Fully itemized cost breakdown with materials, labor, demo, overhead, and profit — ready to hand to a client or use as a takeoff base. Estimate is saved to the project file automatically.
02
Schedule Risk Engine
Smart Schedule Advisor
What it does

A decision-support voice agent that analyzes project schedules and recommends mitigation strategies when risks such as weather, labor shortages, or delivery delays arise. Load your existing project schedule, describe current site conditions, and the Advisor identifies critical path impacts and gives you concrete options.

Capabilities
  • Accepts CPM schedule input (Primavera, MS Project, or structured text)
  • Analyzes disruption against the baseline and calculates float consumption
  • Recommends acceleration options: overtime, crew augmentation, re-sequencing
  • Supports EOT entitlement analysis for delay claim documentation
Output
Ranked list of mitigation strategies with estimated schedule recovery, cost impact, and recommended action. Flags which tasks are on the critical path and which have float to absorb the delay.
03
Schedule Generation Engine
Project Schedule Generator
What it does

A voice-enabled scheduling engine that generates fully structured construction timelines based on your company's workflows and project details. Answer questions about your company and project by voice or text — the AI builds a phase-by-phase construction schedule with real dates, task durations, and assignees.

Capabilities
  • Converts a scheduling conversation into a structured schedule in minutes
  • Applies Last Planner System (LPS) logic for constraint identification
  • Generates an n8n-executable EPC workflow model from the CPM logic
  • Exports to formats compatible with Primavera P6 and MS Project
Output
A complete project schedule with phases, activities, durations, dependencies, and assigned resources — ready to import into Primavera, MS Project, or use as a Last Planner System (LPS) commitment plan.

Next Module

Keep revenue moving — automatically

The Financials module automates invoicing, payment reminders, and lead follow-up so you get paid without chasing.