PRIME Solutions for
Construction Management
Drawing Management: ensuring everyone is working from the current drawing set; Voice-enabled engines (Scheduling, and Estimating); Procurement and AI contract Q&A: RFIs, submittals, POs, COs tracked and searchable in one place; Warehouse: AI-Driven Material Stock, Deliveries & Receiving; 4D Scheduling & Construction Sequence Simulator; 4D BIM takeoff & Cost Estimate; LPS: every commitment, every constraint, tracked daily. The diagram on the right reflects the modules of the first phase of the software.
PRIME Your AI Software Partner
A software having intelligent agents build for residential and commercial construction projects.
PRIME FieldOps
One platform. Every phase. Your whole team — field, office, and ownership — working from the same live data. Eight integrated modules spanning the full project lifecycle — from pre-construction to final payment: Plan & Estimate, Procure & Contract, Build & Track, Invoice & Collect — for GCs, subs, project managers, and owners.
PRIME LPS System
A remote project controls platform built on the Last Planner System — field reports collected every evening via Telegram, WhatsApp, or Email; an AI agent analyzes them overnight; your team validates at morning review before the first tool hits steel.
PRIME 4D-BIM
BIM 4D Scheduling & Takeoff-Cost Estimate pipeline, upload a Revit/IFC file and the system automatically: merges 3D design models with project schedules; finds walls, doors, windows, slabs, other elements; calculates quantities; applies labor and material rates; and produces a draft estimate (HTML dashboard).
PRIME P-Monitor
Drop in a weekly PDF or a monthly spreadsheet — an n8n workflow reads it, an AI agent classifies it by discipline and document type, and a backend engine turns it into EVM metrics, cross-discipline rankings, and a formatted report that emails and Telegrams itself out before the coffee's cold.
What PRIME does for yor business
Four modules, at a glance — what each PRIME app actually does.
Module 1 of 4
FieldOps — Field-to-Office Platform
- Field and office, always in sync. Drawings, RFIs, submittals, and change orders stay current for everyone on the project — in the trailer or offline on a tablet — and issued tasks trigger instant push and email alerts.
- Procurement through to signed contract. Tender alerts, bid comparison, and purchase orders generated from awarded bids roll straight into the budget dashboard; Contracts Q&A answers clause-level questions with the exact page cited.
- Billing and stock, automated. A Value Invoicer drafts invoices from completed tasks, a payment-recovery agent chases unpaid ones, and the Warehouse Assistant answers material and delivery questions against real IFC quantities.
Module 2 of 4
4D-BIM — Scheduling & Takeoff · Cost
- One model, two engines: 4D Scheduling · Construction Sequence Simulator and Takeoff · Cost Estimate share the same parsed IFC building through a stable entity reference ID — never two separate files kept in sync by hand.
- Model to itemized cost, instantly. The IFC is parsed entirely in your browser, classified into 24 CSI-aligned trade groups, and priced against the rate matrix for the selected state and building type — recalculating the moment either changes.
- No model yet? Quick Estimate. One Building Profile and 14 trade formulas across Structural, MEP, and Finishing produce a live, itemized residential cost rollup in minutes, nothing entered twice.
Module 3 of 4
LPS — Last Planner System Daily Controls
- Should vs. can, made visible. LPS asks what will actually happen this week — not what should — closing the gap where most project delays live.
- One board, no re-entry. Pull-plan tickets activate straight onto the 3-week Lookahead, and a delay is flagged the moment it threatens a downstream milestone on the master schedule.
- From sticky note to structured plan. BoardScan reads a photo of the Big Room board into editable tickets in seconds; Percent Plan Complete (PPC) and variance-by-cause update live as the crew marks work done.
Module 4 of 4
P-Monitor — AI Reporting & Automation Suite
- Report in, score out. OCR, AI classification, and a specialized extractor turn any uploaded report into the CPI/SPI numbers a project manager needs — no manual renaming or sorting.
- One trigger, every channel. A single webhook pushes a styled PDF report over email and Telegram while the web dashboard and mobile app update in real time over the same connection.
- Same data, in your pocket. The mobile app mirrors dashboard scores and alerts live, all wired together behind the scenes by one 19-node n8n workflow with no manual step in between.
Integrating cutting-edge AI Trends
Unleashing the potential of cutting-edge Ai trends, such as: Voice-Driven Schedule engines, Last Planner System (LPS) automation, converting CPM schedules into EPC n8n workflow models, much more.
Voice-Driven Schedule Engines
Presenting two cases. A) A voice-enabled scheduling engine that generates fully structured construction timelines based on company workflows and project details, B) A decision-support voice agent that analyzes project schedules and recommends mitigation strategies when risks such as weather or delays arise.
Voice-Guided Estimates
A voice-guided estimating agent that guides contractors through project assumptions and job details while executing backend cost logic. Contractor narrates job details — the agent asks clarifying questions, runs backend calculation logic then produces an estimate and save it to the project files.
Real-Time Progress Tracking
data extraction; classification: disciplines, specialized metrics, multi-curve (planned, actual, earned, forecast); analytics & forecasting: performance trends, performance rankings, detailed discipline charts; report generation: HTML report, PDF conversion, email service, telegram integration, real-time webhook - live dashboard updates.
Generating structured EPC n8n models
Converting CPM schedules into EPC n8n workflows means translating traditional, dependency-based project timelines into dynamic, automated operations, mapping project logic into executable nodes, allowing specific events and milestones to automatically trigger downstream processes.
Explore our AI Software
We work on new Ai data technologies for the construction industry
Supporting your organization to get your own Ai platform to be free from license and subscription fees
BIM Takeoff & Cost Estimate
A full AI-powered takeoff and cost estimate pipeline, upload a Revit/IFC file and the system automatically: finds walls, doors, windows, slabs, other elements; calculates quantities; applies labor and material rates; and produces a draft estimate (HTML dashboard); there is not human intervention in the process.
Get in Touch !!4D BIM Scheduling
A construction simulation and 4D BIM scheduling platform that merges 3D design models (Building Information Modeling, or BIM) with project schedules (time) to create interactive, time-lapsed simulations of the construction process.
Get in Touch !!Estimator Voice-Guided
A voice-driven estimating agent that guides builders and contractors through project assumptions and job details while executing backend cost logic. You speak naturally: "Install 120 square meters of ceramic tile…" The system builds estimate items automatically.
Get in Touch !!Smart Schedule Advisor
A decision-support voice agent that analyzes project schedules and recommends mitigation strategies when risks such as weather or delays arise.
Get in Touch !!Project Schedule Generator
A voice-enabled scheduling engine that generates fully structured construction timelines based on company workflows and project details.
Get in Touch !Residential Last Planner System
A construction project controls built around the Last Planner System (LPS) methodology, involving a Local Agent at Headquarters and a number of n8n workflow templates to produce different results.
Get in Touch !!Construction Contract Admin. System
Connect the entire construction workflow in one intelligent system where AI links RFIs, CORs, delay notices, specification analysis, submittal reviews, drawing references, construction claims/risk documents.
Get in Touch !!BIM Takeoff & Cost Estimate
A full AI-powered takeoff and cost estimate pipeline, upload a Revit/IFC file and the system automatically: finds walls, doors, windows, slabs, other elements; calculates quantities; applies labor and material rates; and produces a draft estimate (HTML dashboard); there is not human intervention in the processs.
Get in Touch !!4D BIM Scheduling
A construction simulation and 4D BIM scheduling platform that merges 3D design models (Building Information Modeling, or BIM) with project schedules (time) to create interactive, time-lapsed simulations of the construction process.
Get in Touch !!Estimator Voice-Guided
A voice-driven estimating agent that guides builders and contractors through project assumptions and job details while executing backend cost logic. You speak naturally: "Install 120 square meters of ceramic tile…" The system builds estimate items automatically.
Get in Touch !!Smart Schedule Advisor
A decision-support voice agent that analyzes project schedules and recommends mitigation strategies when risks such as weather or delays arise.
Get in Touch !!Project Schedule Generator
A voice-enabled scheduling engine that generates fully structured construction timelines based on company workflows and project details.
Get in Touch !!Residential Last Planner System
A construction project controls built around the Last Planner System (LPS) methodology, involving a Local Agent at Headquarters and a number of n8n workflow templates to produce different results.
SGet in Touch !!Construction Contract Admin. System
Connect the entire construction workflow in one intelligent system where AI links RFIs, CORs, delay notices, specification analysis, submittal reviews, drawing references, construction claims/risk documents.
Get in Touch !!AI Solutions Across Projects
PRIME covers residential, commercial and infrastructure sectors including LNG & Mining projects. It addresses project chapters that include scheduling, estimation, project control, and contract management. It connects tenders, budgets, schedules, and reporting in one platform
Residential Sector
Ai real estate residential sector solutions aimed at General Contractors and Subcontractors.
Office Buildings
Ai real estae commercial sector solutions for Office Buildings including: Corporate Office, Multi-Tenant Office, Business Park, Government Office.
Healthcare Buildings
Ai real estae commercial sector solutions for for Healthcare Buildings including: Hospitals, Clinics, Surgical Centers, Emergency Departments, Imaging Centers, Laboratories.
Infrastructuree Projects
Ai infrastructure sector solutions, fine-tuned for specific tasks, offering high accuracy within a particular domain.
LNG Plants
Ai solutions for schedule analysis, EVR, KPIs, PipeShop management, PipeSpool Management, Early underground rough-in analysis, and much more.
Mining Projects
>Ai solutions for schedule analysis, EVR, KPIs, Estimates, Contract Administration, QA/QC reporting, and much more.
Who PRIME Is Built For
Find Your Starting Point
PRIME is designed from the ground up for the four roles that make or break a construction project.
General Contractors
Coordinate every sub, track every RFI, and keep the schedule honest — from groundbreak to punch list.
- Subcontractor coordination
- 4D schedule & cost control
- Inspections & punch lists
- Owner reporting dashboards
Subcontractors
Win more bids, run jobs cleaner, and collect payments faster — without juggling spreadsheets and email threads.
- Voice estimating & takeoffs
- Field logs & daily reports
- Progress billing & collections
- Lead follow-up automation
Project Managers
Keep schedule, cost, and quality on track across multiple projects — with real-time data and AI risk alerts.
- Smart Schedule Advisor
- Earned value & KPI tracking
- Change order management
- Contract Q&A platform
Owners & Developers
Get full project visibility without becoming a construction expert — see spend, schedule, and risk in plain language.
- Budget vs. actual reporting
- Schedule milestone tracking
- Document audit trail
- Procurement intelligence
Why as Contractor You Choose PRIME as your Software Partner
SaaS construction-software vendors have entire playbooks built to keep you locked into six-figure bills.
Here's how Prime help contractors to past their tactics — and what you gain by doing it.
Your Data Stays Portable
- Export blueprints, RFIs, and change-order history anytime — no technical ransom
- No dependency on a single vendor's format to run your own projects
- Freedom to switch, scale, or renegotiate on your own terms
SaaS platforms are built to make years of your own project history expensive and painful to move out — that friction is the strategy, not an accident.
One Flat Price, No Success Tax
- Predictable flat cost, no matter how many RFIs, logs, or reports get automated
- No per-task or per-outcome fees eating into the labor hours you just saved
- Budget certainty across every project, large or small
Big vendors are shifting toward pricing that charges you more every time their AI actually helps you — the more it saves you, the more it costs.
AI Built for the Field, Not Bolted On
- AI-native workflows designed around how field teams actually work
- Faster feature turnaround — weeks, not multi-year release cycles
- Only the tools your crews use, none of the bloat you're paying to ignore
Enterprise vendors are bundling AI features onto decades-old software so switching feels pointless — but bolted-on isn't the same as built-in.
Security Sized to Your Real Risk
- Security and data practices matched to your real project risk, not a blanket enterprise tax
- No paying for certifications and legal frameworks your contracts don't demand
- Simpler systems are easier to audit, secure, and trust
Enterprise sales teams lean hard on compliance and cyber-insurance fears to justify premium pricing — often for coverage well beyond what your projects actually require.