| Description | UoM | Qty | Price | Partial |
|---|---|---|---|---|
| General Requirements | 0 | |||
| General Requirements | LS | 0 | 0 | |
| SLAB FOUNDATION | ||||
| Excavation | CY | 0 | 0 | |
| Gravel (4") | CY | 0 | 0 | |
| Formwork | SF | 0 | 0 | |
| Poured Walls (4') | CY | 0 | 0 | |
| Insulation | SF | 0 | 0 | |
| Stone Backfill | CY | 0 | 0 | |
| Poured Slab | CY | 0 | 0 | |
| Space for Mechanical room | LS | 0 | 0 | |
| . | ||||
| Labor | ||||
| Labor | LS | 0 | 0 | |
| TOTAL | 0 | |||
| . | ||||
| . | ||||
| BASEMENT FOUNDATION | ||||
| Excavation | CY | 0 | 0 | |
| Gravel (4") | CY | 0 | 0 | |
| Poured Basement Floor | CY | 0 | 0 | |
| Poured Walls (9') | CY | 0 | 0 | |
| Waterproofing | LF | 0 | 0 | |
| Insulation | SF | 0 | 0 | |
| Stone Backfill | CY | 0 | 0 | |
| Drain Tile Pipe | LF | 0 | 0 | |
| Sump Pump | EA | 0 | 0 | |
| Egress Windows (x2) | EA | 0 | 0 | |
| Framing 1sf Floor Decking | LS | 0 | 0 | |
| Frame Stair | LS | 0 | 0 | |
| Electrical | LS | 0 | 0 | |
| Labor | ||||
| Labor | LS | 0 | 0 | |
| TOTAL | 0 | |||