| DESCRIPTION | US $ |
|---|---|
| GENERAL REQUIREMENTS | 0 |
| SITE WORK | 0 |
| BASEMENT - INTERIOR & STRUCTURE | 0 |
| GROUND FLOOR - INTERIOR & STRUCTURE | 0 |
| 2nd FLOOR - INTERIOR & STRUCTURE | 0 |
| ROOF CONSTRUCTION | 0 |
| ELECTRICAL | 0 |
| MECHANICAL | 0 |
| TOTAL US $ | 0 |
| Description | UoM | Qty | Price | Partial |
|---|---|---|---|---|
| GENERAL REQUIREMENTS | 0 | |||
| Mobilization | ls | 0 | 0 | |
| Temporary Facilities | ls | 0 | 0 | |
| SITE WORK | 0 | |||
| Excavation & Fill | cf | 0 | 0 | |
| Backfill | cy | 0 | 0 | |
| Landscape | sf | 0 | 0 | |
| Waste Disposal | cy | 0 | 0 | |
| BASEMENT - INTERIOR & STRUCTURE | 0 | |||
| Basement - Substructure | ||||
| Footings (Level) | cy | 0 | 0 | |
| Foundation Walls (Exposed) | cy | 0 | 0 | |
| Flat Slab (Basement Floor) | cy | 0 | 0 | |
| Interior Construction & Finishes | 0 | |||
| Vapour Retarder (Barrier) | sf | 0 | 0 | |
| Thermal Protection | cy | 0 | 0 | |
| Gypsum Board | sf | 0 | 0 | |
| Structural Light Framing | sf | 0 | 0 | |
| GROUND FLOOR - INTERIOR & STRUCTURE | 0 | |||
| Exterior Wall System | 0 | |||
| Windows, Aluminum | sf | 0 | 0 | |
| Waterproofing Membrane | sf | 0 | 0 | |
| Glazed Curtain Wall | sf | 0 | 0 | |
| Exterior Cladding | sf | 0 | 0 | |
| Interior Construction & Finishes | 0 | |||
| Slab on Grade | cy | 0 | 0 | |
| Concrete Masonry Units | cy | 0 | 0 | |
| Sheathing (Sub-Floor) | sf | 0 | 0 | |
| Structural Light Framing | sf | 0 | 0 | |
| Insulation | cy | 0 | 0 | |
| Framing, Ceiling | sf | 0 | 0 | |
| Doors, Wood | ea | 0 | 0 | |
| Flooring, Wood | sf | 0 | 0 | |
| 2nd FLOOR - INTERIOR & STRUCTURE | 0 | |||
| Exterior Wall System | 0 | |||
| Exterior Sheating | sf | 0 | 0 | |
| Exterior Cladding | sf | 0 | 0 | |
| Glazed Curtain Wall | sf | 0 | 0 | |
| Interior Construction & Finishes | 0 | |||
| Sheathing (Sub-Floor) | sf | 0 | 0 | |
| Structural Light Framing | sf | 0 | 0 | |
| Insulation | cy | 0 | 0 | |
| Framing, Ceiling | sf | 0 | 0 | |
| Doors, Wood | ea | 0 | 0 | |
| Flooring, Wood | sf | 0 | 0 | |
| ROOF CONSTRUCTION | 0 | |||
| Sheathing | sf | 0 | 0 | |
| Shingles, Slate | sf | 0 | 0 | |
| Framing, Rafters | sf | 0 | 0 | |
| Thermal Protection | cy | 0 | 0 | |
| Waterproofing membrane | sf | 0 | 0 | |
| Skylights, Metal | sf | 0 | 0 | |
| Flashing | sf | 0 | 0 | |
| SERVICES | 0 | |||
| Electrical | 0 | |||
| Lighting | ea | 0 | 0 | |
| Outlet Box | ea | 0 | 0 | |
| Panelboards | ea | 0 | 0 | |
| Wiring | lf | 0 | 0 | |
| Overcurrent Protection | ea | 0 | 0 | |
| Mechanical | 0 | |||
| Water Softer | ea | 0 | 0 | |
| Water Heater | ea | 0 | 0 | |
| Water Metre Assembly | ea | 0 | 0 | |
| Pipe Insulation | lf | 0 | 0 | |
| Piping | lf | 0 | 0 | |
| Drains | ea | 0 | 0 | |
| Ductwork | lf | 0 | 0 | |
| Duct Insulation | sf | 0 | 0 | |
| Heating & Cooling Piping | ea | 0 | 0 | |