CLEARING | 0 |
Mass clearing using equipment | S41 | glb | 0 | | 0 |
Manual clearing | S39 | glb | 0 | | 0 |
TEST FILL | 0 |
Supply of material Zone 3&4 | S60 | glb | 0 | | 0 |
Loading using front loader | S08 | glb | 0 | | 0 |
Mass fill using 10 ton roller | S04 | glb | 0 | | 0 |
Haul < 1km and dump with volquetes | S09 | glb | 0 | | 0 |
DEWATERING | 0 |
Servicio de bombeo motobomba 4" | S25 | m | 0 | | 0 |
Supply of HDPE 4" SDR32.5 pipes for dewatering | S01 | glb | 0 | | 0 |
HDPE 4" SDR32.5 Pipe Instalation for dewatering | S15 | glb | 0 | | 0 |
DAM CHANNEL PROTECTION | 0 |
Mass Excavation using D8 | S03 | glb | 0 | | 0 |
Concrete placement with pump | S68 | m3 | 0 | | 0 |
GRUBBING | 0 |
Mass Excavation using D8 | S03 | m3 | 0 | | 0 |
Excavation and loading using excavator | S11 | m3 | 0 | | 0 |
Haul < 1km and dump with articulated | S06 | m3 | 0 | | 0 |
Haul > 1km with articulated | S18 | m3 | 0 | | 0 |
Waste dump mainetnance | S13 | m3 | 0 | | 0 |
TOPSOIL STRIPPING | 0 |
Mass Excavation using D8 | S03 | m3 | 0 | | 0 |
Excavation and loading using excavator | S11 | m3 | 0 | | 0 |
Haul < 1km and dump with articulated | S06 | m3 | 0 | | 0 |
Haul > 1km with articulated | S18 | m3 | 0 | | 0 |
Waste dump mainetnance | S13 | m3 | 0 | | 0 |
EARTH EXCAVATION | 0 |
Mass Excavation using D8 | S03 | m3 | 0 | | 0 |
Rippable excavation using D8 | S02 | m3 | 0 | | 0 |
Excavation and loading using excavator | S11 | m3 | 0 | | 0 |
TMF Borrow Pit Development and ongoing operations | 0 |
Mass drill and blast using Tracdrill (detail) | S48 | glb | 0 | | 0 |
Material screening | S30 | m | 0 | | 0 |
Secondary crushing | S12 | und | 0 | | 0 |
Mass fill using 10 ton roller | S04 | m | 0 | | 0 |
Localized structural fill with excavated material | S20 | m | 0 | | 0 |
GEOTEXTILE | 0 |
Geotextil placement | S101 | m | 0 | | 0 |
Geotextil Supply - non woven 200 gr/m2 | S102 | m | 0 | | 0 |
TOTAL | 0 |